The demand for electricity in Zambia is projected to go beyond 2,000 megawatts before end-2011.
Energy
Next-generation engine meets standards for emissions
Already capturing industry attention, the new breed of Cummins engines meets regulatory standards and is designed to deliver all its performance advantages without incurring higher operation costs.
p>Already capturing industry attention, the new breed of Cummins engines meets regulatory standards and is designed to deliver all its performance advantages without incurring higher operation costs.High productivity deep hole drilling
Dormer Tools has introduced a new programme of high performance cobalt alloyed high-speed steel (HSCo) drills. The tools have been created to complement Dormer’s CDX-DH range of solid carbide deep hole drills and have been designed for applications up to 15x diameter.
Evolving telecommunications in Algeria
Alcatel-Lucent has been selected by Sonatrach, the first oil & gas Algerian company, to manage its network evolution and deploy advanced communication services across 157 sites in Algeria.
p>Alcatel-Lucent has been selected by Sonatrach, the first oil & gas Algerian company, to manage its network evolution and deploy advanced communication services across 157 sites in Algeria.USD50m to handle fly ash
South African electricity producer Eskom has signed a contract to equip all six supercritical 800 MW boilers of its currently being built Medupi power station with ash handling technology by the Clyde Bergemann Power Group (CBPG).
p>South African electricity producer Eskom has signed a contract to equip all six supercritical 800 MW boilers of its currently being built Medupi power station with ash handling technology by the Clyde Bergemann Power Group (CBPG).